Record how much of an asset was used as a quantity and unit, such as 1.5 Day or 3 Hours, so asset usage is costed and invoiced correctly and never counted as staff time.
If you donât see Asset Qty and Asset Unit, contact support or your Account Manager to turn asset usage on.
1. Add asset usage in Staff Times
In Staff Times, add an asset entry
Choose the asset and job, then enter the Asset Qty (the quantity used, in the assetâs unit)
Save
Asset Qty is required. If itâs blank youâll see "Enter a quantity".
2. Bulk Producing Times
Turn on the setting in Settings â Timesheet Settings to show Asset Qty and Asset Unit on Bulk Producing Times
Asset rows then save as usage entries with their quantity
3. Mobile app
When staff add an asset with a quantity in the mobile app, itâs saved as its own asset entry, separate from their own timesheet. That means it can be invoiced as its own line and shows in the Assets section of sign-off. An asset added without a quantity stays on the staff timesheet for information only.
4. Where asset usage shows
Staff Times: Asset Qty and Asset Unit columns
Client approval: asset rows show the quantity (for example "Excavator 1.5 Day") and stay out of the hours totals
Timesheet Report and Daily Claim Sheet PDFs: the Hours cell shows the quantity (for example "1.5 Day") and isnât added to total shift hours
Job Timesheets totals: usage sits in an Asset Usage column and adds no hours
Asset usage is never counted as staff time, so it doesnât flow into pay runs or payroll exports.
Summary
Enter Asset Qty for each asset entry; the unit comes from the asset
Turn on Asset Qty and Asset Unit for Bulk Producing Times in Timesheet Settings
Asset usage is costed and invoiced, but never paid as staff time
Related: Asset Timesheets